| |
|
|
 |
|
 |
| |
|
|
| Extra-duty EnviroModules are assembled. |
|
Geotextile is laid over a compacted base. |
| |
|
|
 |
|
 |
| |
|
|
| The welded liner is placed to the base and sides of the pit. |
|
Two pre-cast pits are installed at each end of the tank. |
| |
|
|
 |
|
 |
| |
|
|
| Ausdrain EnviroModules create 90 000 litres of storage volume in the tank. |
|
Tank water is used on the campus for irrigation and toilet flushing. |
| |
|
|