| Discharge control pits are installed
and connected to downpipes |
|
The base of the pit is
levelled using a layer of sand |
| |
|
|
 |
|
 |
| |
|
|
| Geotextile and Canvaccon Liner are placed
to the base and side with sufficient overlap |
|
EnviroModules are placed firmly
on top of and adjacent to one another within the fabric
and liner |
| |
|
|
 |
|
 |
| |
|
|
| The seams of the liner are securely
taped |
|
Geotextile fabric is used to surround
the liner |
| |
|
|
 |
|
 |
| |
|
|
| The tank is backfilled with coarse washed
river sand |
|
Tank is complete and driveway has
been laid. |