This
project involved the installation of a Detention Tank
to capture run-off from roofs at a townhouse development.
A total of 10 cubic metres of AUSDRAIN™ EnviroModules
were installed. The modules were surrounded in Geotex
401 Filter Fabric and Canvaccon Liner to create the
Detention Tank.
EnviroSump Filtration Units have been installed to
filter the water from downpipes so that clean water
enters the system. A pre-cast concrete pit is installed
to one side of the tank and is fitted with maxi mesh
trash screens as a secondary measure to prevent any
debris from entering the tank. The pre-cast pit is
also fitted with an orifice plate that is connected
to council stormwater lines. As the pit and tank fill
up, the water is slowly discharged via the orifice
plate.
The detention tank minimises the discharge to the
council mains at any one time and combined with the
filtration process, prevents discharge of fines and
gross pollutants to nearby Warners Bay. |