 |
|
 |
| |
|
|
| The pit is prepared with
a compacted, level base of sand |
|
Geotextile fabric is
laid on the base and sides of the pit |
| |
|
|
 |
|
 |
| |
|
|
| The assembled modules
are placed inside the fabric |
|
The fabric completely
surrounds the tank |
| |
|
|
 |
|
 |
| |
|
|
| Canvaccon Liner is placed
to the base and sides for the detention tank |
|
The assembled modules
are placed inside the liner |
| |
|
|
 |
|
|
| |
|
|
| The liner completely
surrounds the tank |
|
|
| |
|
|
| |
|
|