ON-SITE DETENTION
| 5. Installation of a 50 cubic metre Detention Tank under a Driveway - St Marys, NSW |
This
project required the installation of a 50 cubic metre
detention tank under a driveway at a villa development
in Sydney. |
![]() |
![]() |
|
| Discharge control pits are installed and connected to downpipes | The base of the pit is levelled using a layer of sand | |
![]() |
![]() |
|
| Geotextile and Canvaccon Liner are placed to the base and side with sufficient overlap | EnviroModules are placed firmly on top of and adjacent to one another within the fabric and liner | |
![]() |
![]() |
|
| The seams of the liner are securely taped | Geotextile fabric is used to surround the liner | |
![]() |
![]() |
|
| The tank is backfilled with coarse washed river sand | Tank is complete and driveway has been laid. |