BIO-REMEDIATION
| 5 Nutrient Removal and Detention Tank System - Lake Macquarie, NSW |
A
5 cubic metre nutrient removal tank and 5 cubic metre
detention tank were constructed on individual housing
lots on a 22 lot residential sub-division close to
Lake Macquarie in NSW. |
![]() |
![]() |
|
| The pit is prepared with a compacted, level base of sand | Geotextile fabric is laid on the base and sides of the pit | |
![]() |
![]() |
|
| The assembled modules are placed inside the fabric | The fabric completely surrounds the tank | |
![]() |
![]() |
|
| Canvaccon Liner is placed to the base and sides for the detention tank | The assembled modules are placed inside the liner | |
![]() |
||
| The liner completely surrounds the tank |